top of page

Booster Pressure-Tank Drawdown: Check Pump Run Time and Starts per Hour

Oct 17
5 min read
Original conceptual pressure-tank illustration distinguishes 200 litres nominal tank volume from 60 litres usable drawdown and links the usable volume to a pump cycle.

A pressure-tank submittal can show a generous shell volume while the booster still cycles frequently. The operating question is how much water the tank releases between pump stop and restart, and how quickly that volume is used and replaced. That usable drawdown is the starting point for a cycling calculation.


For a simple on/off-controlled pump, two checks are worth keeping separate: the shortest pump run and the highest repeated starts per hour. They occur at different demand conditions in the simplified model below. Checking only the building’s peak flow can miss the condition that produces the most frequent switching.


Read drawdown separately from nominal volume


A diaphragm tank stores water by compressing its gas cushion. Some of its shell volume remains occupied by gas, and some water can remain when the restart pressure is reached. Drawdown is the water delivered while pressure falls from the defined stop pressure to the defined restart pressure. It depends on the operating pressure band, precharge and product behavior.


For a concrete catalog example, Amtrol’s Well-X-Trol quick-sizing sheet lists the WX-203 with a 32.0 US gal tank volume and 8.6 US gal drawdown in its 40/60 psig column. The listed drawdown is about 26.9% of the nominal volume. This illustrates how to read a table; it is not a recommendation for a particular booster.


Use the drawdown associated with the selected product’s actual operating conditions. Maximum acceptance volume, nominal shell volume and usable drawdown are different entries. Do not transfer a catalog fraction to another pressure band or model. Reflex’s pressure-maintenance overview explains the buffer function as temporarily storing the difference between pumped flow and required flow.


Define a deliberately simple cycle model


Assume a hypothetical tank with 200 L nominal volume and 60.0 L usable drawdown, denoted D. The 60 L is a declared teaching input; it would need confirmation from the actual tank submittal and approved settings. Assume a single on/off pump delivers a constant Qp = 1.20 L/s throughout refill, and downstream demand q remains constant during the complete cycle.


Also neglect control delays, leakage outside the stated demand, water compressibility and any additional storage. Consider 0 < q < Qp, so the pump can refill the tank while serving demand. The assumed constant pump delivery simplifies a real pump curve and is not a claim about every fixed-speed pump.


While the pump is off, all demand comes from drawdown: toff = D/q. While it runs, only the surplus Qp − q refills the tank: ton = D/(Qp − q). Both times are seconds when volume is litres and flows are L/s. The complete cycle is toff + ton, and repeated starts per hour are N = 3,600/(toff + ton).


Work the cycle at one-quarter pump capacity


At q = 0.30 L/s, pump-off time is 60.0/0.30 = 200 s. During refill, 1.20 − 0.30 = 0.90 L/s goes into the tank, giving pump-on time 60.0/0.90 = 66.67 s. A cycle lasts 266.67 s, corresponding to 13.5 starts per hour under this sustained demand.


Dividing drawdown by full pump delivery would give 50 s for refill. That omits the 0.30 L/s still going to the building. The pump must serve the demand and restore the tank’s usable water volume simultaneously. A measured fill time should be interpreted against the demand present during that test.


The highest cycling rate occurs at half flow in this model


At q = 0.60 L/s, off time is 100 s and on time is also 100 s. The 200 s cycle produces 18 starts per hour. Increasing demand again to 0.90 L/s gives 66.67 s off and 200 s on, restoring the cycle length to 266.67 s and the rate to 13.5 starts per hour.


Calculated starts per hour form a curve peaking at 18 starts per hour when demand is half the assumed 1.20 litre per second pump delivery. With 60 litres usable drawdown, half-flow operation has 100 seconds off and 100 seconds on.

Original constant-flow teaching model: D = 60 L usable drawdown and Qp = 1.20 L/s. Real pump curves, demand changes and controller logic can change the timing. Curve endpoints show limits; repeating cycles require 0 < q < Qp.


Combining the time equations gives N = 3,600q(Qp − q)/(DQp). For fixed D and Qp, the numerator q(Qp − q) is greatest at q = Qp/2. Therefore Nmax = 3,600Qp/(4D). Here that is 3,600 × 1.20/(4 × 60.0) = 18 starts per hour.


At zero demand, a leak-free tank does not repeatedly draw down after the pump stops. As demand approaches pump delivery, refill becomes very slow. At demand equal to or greater than delivery, this simple repeating cycle no longer applies. These boundary cases explain why peak demand and maximum cycling are not the same check.


Grundfos’s GT pressure-tank data booklet includes the permitted starts/stops rate and operating pressures in its tank-volume method. Use the selected pump and controller’s requirements; the booklet’s example assumptions are not universal allowable settings.


Check minimum run time as a separate condition


For the model, the shortest refill occurs when demand falls to zero just after the pump starts. Then ton,min = D/Qp = 60.0/1.20 = 50 s. This can be the limiting run-time case even though zero demand produces no continuing series of cycles after that refill finishes.


Suppose the exercise’s review criteria require at least 60 s run time and no more than 12 repeated starts per hour. These are assumed criteria, not manufacturer limits. The first requires D ≥ Qp × 60 = 72 L. The cycling criterion requires D ≥ 3,600Qp/(4 × 12) = 90 L. In this example the cycling check governs.


With 90 L usable drawdown, minimum refill time becomes 90/1.20 = 75 s, while the half-flow cycle is 150 s off plus 150 s on: 12 starts per hour. The result is a drawdown target for the stated model, not a 90 L nominal-tank selection. The manufacturer must relate that usable volume to the actual pressure band and approved product.


Carry the assumptions into the equipment review


Real pump delivery varies with pressure and suction conditions. Demand may also vary as pressure changes, and staged pumps or variable-speed controls alter the sequence. Amtrol’s commercial sizing guidance explicitly checks pump capacity across the operating pressure range. A detailed timing calculation can account for changing refill flow rather than assuming one constant value.


  • Record the tank’s actual usable drawdown and the pressure and precharge basis behind it.

  • Verify pump delivery through the relevant pressure range, rather than using a nameplate maximum flow.

  • Check the approved minimum-run and switching criteria for the selected equipment.

  • Include controller delays, staging and variable-speed stop/restart behavior where applicable.

  • During planned commissioning, record pressures, demand, pump-on time and pump-off time together.


Do not widen pressure settings simply to obtain more drawdown: the building’s pressure requirements and all component limits still govern. Have the responsible designer and supplier resolve the final selection and operating sequence. A tank used for on/off-cycle buffering should also not be confused with a closed heating system’s thermal-expansion calculation.


For a connected review of plumbing flow, pipe sizing and booster duties, explore the paid MEP Pipe Design and Sizing Handbook. Its published coverage includes plumbing booster pumps, worked calculations and a design-review checklist. Keep the usable-drawdown and timing checks beside the pump duty so the final submittal can be reviewed as a system.



Comments

Rated 0 out of 5 stars.
No ratings yet

Add a rating
bottom of page