Detention Storage Routing: Peak Inflow Does Not Set the Maximum Stored Volume

Original illustrative engineering schematic. The worked calculation below uses explicit example inputs.
A drainage review can correctly estimate a peak runoff rate and still leave the storage question unanswered. Flow has units of volume per time; detention capacity has units of volume. The maximum stored volume depends on the sequence of inflows, the outlet behavior and the starting storage. Multiplying the highest inflow by an arbitrary duration does not describe those interactions.
This article uses an invented hydrograph and a deliberately simple linear storage relationship to demonstrate routing arithmetic. It is not a detention-tank design for Qatar or any other jurisdiction. There is no local rainfall basis, approved discharge limit, site geometry, flood criterion or emergency overflow design in this example. Those require project-specific hydrological and competent engineering review.
Start with continuity, then define the outlet
The US Army Corps of Engineers explains storage routing using conservation of mass. Over a time interval, storage increases by inflow volume minus outflow volume. For the trapezoidal form used here, each flow is averaged between the beginning and end of the interval. An additional relationship between storage and outflow closes the calculation.
S2 − S1 = (dt / 2) × [(I1 + I2) − (O1 + O2)].
Illustrative linear storage relationship: S = K × O.
Therefore S2 = [S1 × (1 − dt / (2K)) + dt × (I1 + I2) / 2] / [1 + dt / (2K)].
Here S is storage in m³, I and O are inflow and outflow in m³/s, dt is seconds and K is seconds. The linear relationship is a mathematical teaching model, not an assumed orifice law. A real outlet commonly needs a reviewed level–discharge curve together with level–storage information, including downstream effects where relevant.

Linear mathematical storage model, K = 600 s and timestep = 300 s; sampled maximum is not a final design capacity.
State the complete example
Use K = 600 seconds, a five-minute step dt = 300 seconds, and initial S = 0 m³ with O = 0 m³/s. Inflow ordinates at 0, 5, 10, 15, 20, 25 and 30 minutes are respectively 0, 0.02, 0.06, 0.10, 0.06, 0.02 and 0 m³/s. Assume inflow changes linearly between these points. There is no infiltration, evaporation, other inflow or overflow in this model.
These assumptions matter as much as the formula. The supplied points are not five-minute average flows; they are endpoint values. Treating them as interval averages would define a different hydrograph. Likewise, an initially partly occupied tank would have a different available volume and, under this relationship, a different initial discharge.
dt / (2K) = 300 / 1,200 = 0.25.
At 5 minutes: S = [0 + 300 × (0 + 0.02) / 2] / 1.25 = 2.400 m³.
O = S / K = 2.400 / 600 = 0.00400 m³/s.
At 10 minutes: S = [0.75 × 2.400 + 150 × (0.02 + 0.06)] / 1.25 = 11.040 m³.
Continue the same recurrence without rounding intermediate cells. Storage at 15, 20, 25 and 30 minutes is 25.824, 34.6944, 30.41664 and 20.649984 m³. Corresponding outlet flows are 0.04304, 0.057824, 0.0506944 and 0.03441664 m³/s. Displaying fewer decimals in a review table is sensible; discarding precision inside the recurrence is unnecessary.
The largest sampled storage follows the inflow peak
The maximum supplied inflow ordinate occurs at 15 minutes, but the largest sampled storage occurs at 20 minutes. At 15 minutes, inflow is still much larger than outflow, so storage continues to accumulate. By 25 minutes, outflow exceeds inflow and storage is falling. The system's response is delayed rather than simply proportional to the instantaneous inflow.
The 34.6944 m³ result is the largest value at the chosen grid points, not a proven exact continuous-time maximum. The true peak can fall between them. A smaller timestep and a convergence check are necessary before relying on a peak estimate. Even a converged result would still describe the assumed model, not validate the inflow or outlet assumptions.
Close the volume balance
The hydrograph's total inflow through 30 minutes is 78.000 m³ using trapezoidal integration. The integrated outflow through that time is 57.350016 m³. Their difference is 20.649984 m³, equal to the calculated final storage. That agreement is a useful spreadsheet check, but it is not independent proof that the model represents the actual site.
The remaining water has not disappeared when the inflow reaches zero. Continue routing until the period of interest is complete. At 35 minutes with no further inflow, this recurrence gives 12.3899904 m³, and the outlet still flows. Stopping the volume account at the end of rainfall can conceal residual storage before a subsequent event.
Review the model before interpreting a capacity
Confirm whether inflow data are endpoint ordinates or interval averages and preserve their timestamps and units.
Establish starting storage from a documented initial condition rather than assuming every storm begins with an empty facility.
Use the actual reviewed storage and outlet relationships; a constant release and a level-dependent outlet are different models.
Check continuity at each interval and over the complete event, including the recession period.
Reduce the timestep and compare peak storage, peak outflow and their timing.
Keep physical capacity, unusable volume, freeboard and emergency pathways outside this simplified arithmetic until properly evaluated.
The practical next step is a transparent routing worksheet or validated hydraulic model with explicit evidence for every input. The MEP Pipe Design and Sizing Handbook is a related paid reference for the wider drainage and piping design workflow, not an assertion that it includes detention-routing software. A competent project reviewer must establish whether a proposed facility meets the applicable drainage requirements.
Continue the calculation review
Sources and calculation basis
Primary references checked on 25 October 2026. The worked examples and diagrams are original illustrative calculations, not manufacturer selections or project approvals. Apply the stated limitations and the requirements governing the actual project.