A drainage calculation can use the right internal diameter, slope and roughness coefficient and still give the wrong answer. The missing step is often the geometry of the water actually occupying the pipe. When a circular drain runs part full, its wetted perimeter changes with depth, and the hydraulic radius changes with it.


This review method is for an idealized reach with steady, uniform, free-surface flow. It helps check a calculation sheet or understand a modeled result. It does not select a building drain from fixture units, establish a permitted filling ratio, assess venting or determine the behavior of a surcharged network.


State the hydraulic model before entering numbers


Manning’s equation relates discharge to flow area, hydraulic radius, roughness and friction slope. FHWA’s hydraulic reference explains the normal-flow relationship. The friction slope may be replaced by the pipe invert slope only when the uniform-flow assumptions are appropriate. Backwater, an outlet control or a junction disturbance can invalidate that substitution.



For SI units: Q = (1/n) × A × R^(2/3) × S^(1/2).


R = A/P.


Q: m³/s; A: water cross-sectional area in m²; P: wetted perimeter in m; R: hydraulic radius in m; S: friction slope in m/m.


n is the Manning roughness coefficient, using the SI form of the equation.


The wetted perimeter is the pipe wall touching the water. It excludes the horizontal water surface. Hydraulic radius is an area-to-perimeter ratio, not the physical pipe radius and not the depth of water. Use the actual internal bore, especially when a nominal size covers more than one wall thickness.


  • Identify the reach and its upstream and downstream hydraulic boundaries.

  • Record internal diameter, surveyed invert slope and the basis for the selected roughness coefficient.

  • State whether the calculation predicts normal depth from flow or predicts flow at an assumed depth.

  • Keep local losses, downstream restrictions and network surcharge assessment visible as separate checks.


Two 200 mm circular drain cross sections show depths of 60 and 100 mm. Only the submerged curved wall is highlighted as wetted perimeter. Flows are 4.542 and 11.596 L/s.

At 60 mm depth, area is 0.007927 m² and wetted perimeter 0.23186 m; at 100 mm they are 0.015708 m² and 0.31416 m.


Derive the partial-circle geometry


Let D be internal diameter and y the vertical water depth measured from the invert. Define θ as the central angle occupied by the wetted arc, in radians. The circular-segment area follows from the sector area minus the associated triangle; this construction also works above half depth when the signed sine term is retained.


θ = 2 × arccos(1 − 2y/D).


A = (D²/8) × (θ − sin θ).


P = Dθ/2.


R = A/P.


Use radian mode consistently in the trigonometric expressions.


EPA’s SWMM hydraulic reference treats circular cross-section properties as depth-dependent quantities and tabulates the full-section reference geometry. The equations above make that geometry explicit for a hand check. A spreadsheet should reject y below zero or above D rather than silently return a plausible number. Handle a dry pipe explicitly as Q = 0: at y = 0, both A and P are zero, so directly evaluating A/P gives an undefined 0/0. At y = D, retain the result as the full-section reference, not automatic permission to apply an open-channel model to pressurized flow.



Worked example: a 200 mm bore at 60 mm water depth


Assume a clean, unobstructed circular reach with D = 0.200 m, y = 0.060 m, n = 0.013 and S = 0.005 m/m. These are teaching inputs, not recommended project criteria or a material specification. Assume the reach is long enough for uniform flow and that neither end imposes backwater at the section being checked.


y/D = 0.060/0.200 = 0.30.


θ = 2 × arccos(0.40) = 2.318559 rad.


A = 0.00792673 m².


P = 0.23185590 m.


R = 0.03418819 m.


Q = (1/0.013) × 0.00792673 × 0.03418819^(2/3) × 0.005^(1/2)


Q = 0.00454172 m³/s = 4.542 L/s.


Mean velocity = Q/A = 0.573 m/s.


The full-section reference area is 0.03141593 m² and its hydraulic radius is 0.05000 m. Using the same roughness and slope gives a full-section reference discharge of 23.192 L/s. The 60 mm-deep result is therefore about 19.6 percent of that reference discharge, even though the depth is 30 percent of the bore.


Suppose a reviewer uses the correct partial area but retains R = D/4 = 0.050 m. The calculated discharge becomes 5.852 L/s, about 28.8 percent above the correct result for these assumptions. This isolates the geometry error without changing any other input. Multiplying full-section discharge by the depth fraction would introduce a different error.


Use half-full flow as an independent check


At exactly half depth, the water area is half of the full circular area and the wetted perimeter is half of the circumference. Their ratio is unchanged. This provides a simple geometry check that does not depend on the general segment formula.


At y = D/2 = 0.100 m:


A = πD²/8 = 0.01570796 m².


P = πD/2 = 0.31415927 m.


R = D/4 = 0.05000 m.


Q = 11.596 L/s, exactly half of the full-section reference discharge.


Mean velocity = 0.738 m/s, equal to the full-section reference velocity.


If a spreadsheet fails this test, first inspect degree-versus-radian settings, the area formula and whether the free-surface width was accidentally added to the wetted perimeter. Do not change n to force agreement. A roughness adjustment can hide a geometry defect while leaving every other depth wrong.


Check the assumptions that matter more than rounding


For the 60 mm-deep example, changing only n from 0.013 to 0.015 lowers discharge to 3.936 L/s. Changing only slope from 0.005 to 0.003 lowers it to 3.518 L/s. These sensitivities hold depth fixed. If actual flow is fixed instead, the water depth must be solved again; it does not remain at 60 mm.


A useful calculation record therefore separates measured geometry from assumed hydraulic properties. State how the slope was established, whether sediment or deformation reduces the flow area, and why the roughness input represents the proposed condition. Additional decimal places in the result do not compensate for an uncertain invert survey.


Above half depth, the area and hydraulic radius do not change in the same proportion. The ideal circular-section flow relationship is not a straight line and reaches a maximum below the crown under constant-n assumptions. Do not treat this mathematical behavior as permission to increase a project’s allowable filling ratio.



Turn the result into a review decision


  • Recalculate A, P and R for each proposed depth rather than copying a full-bore cell.

  • Check Q = A × mean velocity using unrounded values.

  • Run the half-full check and compare selected depths with an independently prepared geometry calculation.

  • Confirm whether downstream level, fittings or junctions require a water-surface profile or network model.

  • Apply the adopted plumbing or drainage requirements separately, including permitted sizing methods, minimum gradients and ventilation arrangements.


The useful deliverable is a transparent statement: under this geometry, roughness, slope and flow model, the calculated discharge is this value. A suitable capacity decision also needs the actual inflow basis and the project’s hydraulic and regulatory constraints. Keep that distinction in the review comments instead of attaching an unsupported “compliant” label to the arithmetic.


For a wider piping reference, the MEP Pipe Design and Sizing Handbook includes plumbing drainage, storm-water topics, worked examples and calculation templates. Use it to organize the broader design review alongside the project requirements and selected pipe data.



Continue the calculation review




Sources and calculation basis


Primary references checked on 22 October 2026. The worked examples and diagrams are original illustrative calculations, not manufacturer selections or project approvals. Apply the stated limitations and the requirements governing the actual project.