Open-Tank Transfer Pumps: Check Duty at Both Tank-Level Extremes

Oct 18
4 min read
Original illustration of two open tanks at changing water levels, linked by a transfer pump, highlighting a static-head range of 13 to 19 metres.

A transfer pump is often scheduled against one static lift, even though its source tank falls while the receiving tank fills. The pipe route has not changed, but the energy required to move the next cubic metre has. A selection that looks adequate at the average levels may deliver too little flow near the end of the transfer. At the opposite extreme, it may deliver more flow than the system or pump should accept.


Treat the tank levels as operating inputs. The useful deliverable is a duty envelope showing the credible lowest and highest resistance conditions, followed by the manufacturer’s checks at those points. The original example below shows how to build that envelope without mistaking a nominal flow for the actual installed duty.


1. Put the calculation boundaries at the right places


For two large tanks open to the same atmosphere, with negligible velocity at their free surfaces, static head is Hstatic = zdestination − zsource. Both elevations must use one datum. The pump centreline helps establish suction conditions, but it is not the upstream free-surface elevation in this energy balance.


The Hydraulic Institute system-curve reference separates static head from flow-dependent losses and specifically recommends considering a family of curves for changing levels and operating conditions. For pressurized tanks, include the surface-pressure difference divided by ρg as well. Keep that pressure term out of this atmospheric-tank example.


Check the discharge detail before using the receiving water level. This example assumes a liquid-filled discharge path terminating below the receiving surface throughout the stated range. If the pipe instead discharges as a free jet above the water, the relevant outlet elevation and velocity boundary must be used. Changing the receiving level below that free outlet does not automatically change static lift.


2. Turn the operating levels into two system curves


Assume source-tank levels range from elevation 2.0 to 5.0 m, while receiving-tank levels range from 18.0 to 21.0 m. These are example elevations, not tank dimensions. The minimum lift is 18.0 − 5.0 = 13.0 m. The maximum lift is 21.0 − 2.0 = 19.0 m. At the midpoint levels, the lift is 16.0 m.


Assume the complete path loss, including suction pipe, discharge pipe, fittings and entrance/exit losses, is 0.010Q² m when Q is entered in m³/h. The coefficient has units m/(m³/h)². Hold the resistance coefficient fixed for this teaching calculation; real friction factors, valve positions and equipment losses may vary.


The two bounding system curves are therefore Hlow = 13 + 0.010Q² and Hhigh = 19 + 0.010Q². These are minimum- and maximum-static-head cases, not minimum- and maximum-flow labels. For this descending pump curve, the higher system curve will produce the lower flow.


Confirm that both corner combinations can actually occur. A transfer cycle can couple the source and receiving levels, while independent supply and demand can create other combinations. Use the controls and storage operating bands to define credible cases; do not assemble an impossible worst case or omit one the control sequence permits.


3. Find both intersections with the selected pump curve


For illustration, use an invented fixed-speed pump curve Hpump = 34 − 0.015Q², with H in metres and Q in m³/h. Assume the equation is available over 20–32 m³/h solely for this example. It is not a product curve, and its endpoints are not evidence of an approved operating region.


Set pump head equal to system head: 34 − 0.015Q² = Hstatic + 0.010Q². Rearranging gives Q = √[(34 − Hstatic)/0.025]. The Hydraulic Institute combined-curve guide explains this intersection method. An active flow-control valve would add its own changing loss and require a separate controlled-duty review.


  • At 13.0 m static lift: Q = 28.98 m³/h, with pump head 21.40 m.

  • At 16.0 m midpoint lift: Q = 26.83 m³/h, with pump head 23.20 m.

  • At 19.0 m static lift: Q = 24.49 m³/h, with pump head 25.00 m.


Original calculated head-flow chart. Pump H equals 34 minus 0.015 Q squared. Static heads of 13, 16 and 19 metres give duties of 28.98, 26.83 and 24.49 cubic metres per hour, respectively.

Original teaching curves with Q in m³/h and H in m. Fixed pipe resistance and invented pump performance; check real manufacturer limits separately.


The unchanged fixed-speed pump moves through a 4.49 m³/h flow range as the levels change. Comparing every case at the nominal flow would hide that movement. Conversely, reading the pump’s zero-flow head would not establish the delivery rate at either end of the cycle.


4. Test the required transfer rate at the limiting condition


Suppose the project requires at least 26.0 m³/h throughout transfer. At that flow the pump model supplies 34 − 0.015 × 26² = 23.86 m. The highest-lift system requires 19 + 0.010 × 26² = 25.76 m, leaving a 1.90 m shortfall. The midpoint intersection exceeds 26.0 m³/h, but the selection still fails the stated all-level requirement.


A larger pump is not the automatic answer. Compare an appropriate selection, approved variable-speed control, revised storage operating bands or reduced path resistance against the actual service requirement. Each option changes a different input. Any revised selection must also remain acceptable at the lowest lift, where flow is highest.


For a batch-volume check, assume both tanks have constant 8.0 m² plan areas. Transferring 24.0 m³ lowers the source by 3.0 m and raises the receiver by 3.0 m, moving from the 13.0 m lift case to the 19.0 m case. With no other inflow or outflow, transfer time must lie between 24/28.98 and 24/24.49 hours, approximately 49.7–58.8 minutes. An exact time requires integrating the changing flow or calculating small level steps.


5. Review the full envelope before issuing the schedule


The Hydraulic Institute operating-region guidance identifies power, suction conditions, hydraulic loading and temperature rise among the factors limiting allowable operation. Check supplier head, efficiency, absorbed-power and NPSH data at every relevant intersection. A head-curve intersection alone does not approve the duty.


  • Record source and destination level ranges, common datum, surface pressures and discharge arrangement.

  • Calculate each credible static-head case and its corresponding flow-dependent losses.

  • Check maximum flow against downstream capacity, pump limits and motor power.

  • Evaluate suction margin and inlet submergence across the relevant source levels and flows.

  • Document the required transfer rate, batch volume, operating sequence and unresolved supplier checks.


For a clearer, reviewable system-head calculation, the paid Pump Head Calculator Design Suite v1.0 provides editable pipe, fitting, equipment and static-head inputs with a printable report. Prepare the relevant level cases alongside the manufacturer’s curves so the final pump schedule represents the operating range that the tanks will actually create.