AHU Air Leakage After the Cooling Coil: Quantify the Hidden Moisture Load

Illustrative engineering scene. The worked calculation below uses explicit example inputs.
An AHU cooling coil can produce the scheduled leaving humidity while the air delivered downstream is too moist. One possible cause is air entering the casing after the coil, where it bypasses dehumidification altogether. In a drawthrough arrangement, the section between coil and fan may be below the pressure of its surroundings, creating a route for humid infiltration.
The useful calculation begins at that specific section. A whole-unit leakage percentage does not identify where the air enters, what humidity it carries or whether it passes through the coil. The example below isolates a post-coil mixing pocket and quantifies both the resulting supply state and the leakage rate that would exhaust a stated moisture allowance.
Confirm the pressure direction and the air source
Trane's engineering guidance documents infiltration through negative-pressure AHU sections, including openings downstream of cooling coils. It also distinguishes infiltration-related condensation from coil carryover and other moisture sources. These mechanisms need different corrective work; wet surfaces alone do not prove that coil face velocity is excessive.
Measure the casing-section pressure relative to the space that can actually leak into it. An AHU indoors may draw plantroom air rather than outdoor air, so use the plantroom condition. Confirm the measurement plane and fan arrangement instead of assuming every casing panel sees the same pressure. An outward leak from a positive-pressure section requires a different balance.
Original example and control-volume assumptions
Coil leaving dry-air mass flow: 4.000 kg/s.
Coil leaving air: 12.0°C with humidity ratio Wc = 0.008000 kg water/kg dry air.
Infiltrating dry-air mass flow: 0.200 kg/s.
Infiltrating air: 30.0°C with Wl = 0.018000 kg/kg dry air.
Absolute pressure: 101.325 kPa.
Steady adiabatic mixing, no moisture storage, liquid evaporation or condensation in the modeled pocket, and no fan heat before the outlet measurement plane.
These humidity ratios are 8.0 and 18.0 g/kg dry air. They are not relative humidities. The resulting mixed stream contains 4.200 kg/s of dry air because the leakage is an additional stream. Reusing the coil's 4.000 kg/s as the outlet mass would violate conservation and overstate the mixed humidity.
Wmix = (mcWc + mlWl) / (mc + ml) = (4.000 × 0.008000 + 0.200 × 0.018000) / 4.200 = 0.00847619 kg/kg dry air, or 8.476 g/kg.
The leak is 5% of the coil dry-air flow, but 4.762% of the final mixed dry-air flow. Always name that denominator. In this example, a final supply-moisture ceiling of 8.200 g/kg would be exceeded even though the coil itself is producing 8.000 g/kg.

Mixing 4.000 kg dry air/s at 12°C and 8.000 g/kg with the specified humid leak gives 4.200 kg/s at 12.872°C and 8.476 g/kg, before fan heat.
Calculate the temperature from enthalpy, not RH averaging
ASHRAE's moist-air mixing basis uses dry-air mass, moisture and enthalpy balances. For this illustrative calculation, use h = 1.006T + W(2501 + 1.86T), with h in kJ/kg dry air and T in °C. Do not average relative humidity or apply the temperature difference alone to represent the added moisture.
Coil h = 32.25856 kJ/kg dry air. Leakage h = 76.20240 kJ/kg dry air. Mixed h = (4.000 × 32.25856 + 0.200 × 76.20240) / 4.200 = 34.35112 kJ/kg dry air. Tmix = (hmix − 2501Wmix) / (1.006 + 1.86Wmix) = 12.872°C.
A temperature rise of less than 0.9°C can therefore accompany a moisture limit failure. Downstream fan heat would increase temperature further without reducing humidity ratio. A temperature-only controller might conceal the moisture problem by driving the coil colder, while a humidity sensor could report a different relative humidity simply because the sensing temperature changed.
Compared with an equal final dry-air flow entirely at the original coil leaving state, this leak adds 0.200 × (0.018 − 0.008) × 3600 = 7.20 kg/h of water vapor. The corresponding mixed-stream enthalpy excess is 0.200 × (76.20240 − 32.25856) = 8.789 kW. This is a state-difference budget, not electrical power or an exact additional coolant duty.
Solve the moisture budget for a leakage ceiling
Suppose the coil state and 4.000 kg/s coil dry-air flow remain fixed, while the maximum acceptable mixed humidity ratio is 0.008200. Rearrange the same moisture balance rather than applying a generic allowable leakage percentage. This calculation applies when the leaking air is wetter than the limit and the coil air is drier than it.
ml,max = mc × (Wlimit − Wc) / (Wl − Wlimit) = 4.000 × (0.008200 − 0.008000) / (0.018000 − 0.008200) = 0.081633 kg dry air/s.
That is approximately 2.04% of coil dry-air flow under the stated conditions. Substituting it back into the mixing equation returns 8.200 g/kg. It is a moisture-budget ceiling, not an AHU casing-leakage class or a contractual test limit. Different ambient humidity, coil performance or operating pressure changes the result.
Evaluate compensation without assuming the coil can achieve it
If the original 0.200 kg/s leak remains, a final humidity ratio of 8.000 g/kg requires the coil to deliver only 7.500 g/kg. If the final pre-fan temperature must also remain at 12.0°C, the required coil enthalpy becomes 30.06137 kJ/kg dry air, corresponding to approximately 11.083°C at that humidity ratio.
Those are mathematical target states, not proof of available capacity. Request a manufacturer selection at the actual air and water conditions before claiming the existing coil can compensate. Restoring the casing seal may address the source more directly than lowering the operating target and accepting an avoidable moisture burden.
Use independent checks before diagnosing the leak
Set leakage flow to zero: the mixed state must return exactly to the coil state.
Set leakage humidity equal to coil humidity: mixed humidity must remain unchanged, even if leakage temperature differs.
Verify moisture closure: 4.000 × 0.008000 + 0.200 × 0.018000 = 4.200 × 0.00847619, allowing only rounding.
Reverse the calculation: ml = mc(Wmix − Wc)/(Wl − Wmix). The example returns 0.200 kg/s.
The inverse calculation becomes sensitive when the measured humidity differences are small. Use synchronized, representative measurements and quantify uncertainty before treating an inferred leakage rate as a field result. If condensate forms on surfaces or retained water evaporates, include that liquid-water term; a vapor-only inference will otherwise assign the missing moisture to the wrong cause.
The final bulk state in this example is below saturation, but that does not rule out local condensation. Incoming humid air may contact colder metal before it mixes. Compare local surface temperature with the entering air's dew point, and inspect the specific leakage path under the approved maintenance procedure. After corrective work, repeat pressure, flow and humidity checks at comparable conditions.
Get the complete AHU Selection & Fault Diagnosis Handbook for coordinated casing, coil, humidity and commissioning review. Its worked examples and checklists help organize the investigation; the final conclusion still depends on the actual leakage path, operating data and manufacturer information.
Continue the calculation review
Sources and calculation basis
Primary references checked on 22 October 2026. The worked examples and diagrams are original illustrative calculations, not manufacturer selections or project approvals. Apply the stated limitations and the requirements governing the actual project.


Comments