AHU Casing Leakage: Convert the Class Rate Using the Correct Casing Area and Test Pressure

An AHU submittal states a casing leakage class. A test report records litres per second. The reviewer needs a reliable bridge between the two. That bridge is the applicable leakage-rate limit multiplied by the casing area defined for the test, with the pressure, direction and test basis kept consistent. Using the AHU footprint, mixing pressures or confusing leakage with a percentage of supply airflow can overturn the comparison.
1. Establish the governing document before using its table
Record the project specification, test standard and edition, supplier declaration, tested configuration and report revision. The BSI record for BS EN 1886 lists the 2025 edition as current and the 2007 edition as historical. An older handbook table should therefore not be treated as a complete statement of current test requirements.
For example, Eurovent Recommendation 6/15, first edition, update 1, published in August 2025, discusses external casing leakage with separate pressure conditions in sections 4.1 and 4.2. Read those provisions in their stated context. Do not combine a class table from one source with a test procedure or notation from a different edition.
Also identify whether the evidence describes a model box, a particular assembled unit or a site test. These are different evidence boundaries. A construction-family report can be relevant to a supplied unit, but its applicability must be demonstrated through the declaration and applicable scheme. The calculations below do not grant a class or certify equipment.
2. Translate the rate into a total-flow limit
When the agreed limit f is expressed in L/(s·m²), the matching total leakage limit is Qlimit = f × A, with A in m². The result is L/s. Convert L/s to m³/h by multiplying by 3.6. To review a measured total flow in the opposite direction, calculate the area-normalized rate fmeasured = Qmeasured ÷ A.
Obtain A from the test boundary drawing or area schedule and check what is included. Ask how end connections, temporary closures, section interfaces and any independently tested compartments are treated under the specified method. Do not substitute the room footprint or nominal airflow opening simply because those dimensions are easier to find.
3. Worked example: the footprint is only one of four surfaces
Consider an original hypothetical test-review exercise. The casing section is 4.00 m long, 2.00 m wide and 2.00 m high. For this example only, the agreed area schedule counts the top, bottom and two longitudinal sides, while excluding two full-face end connections closed by temporary test blanks. This is an explicit example convention, not a general EN 1886 area rule. Use the actual specified method on a project.
Top and bottom: 2 × 4.00 × 2.00 = 16.00 m².
Two longitudinal sides: 2 × 4.00 × 2.00 = 16.00 m².
Declared test area: 16.00 + 16.00 = 32.00 m².
AHU footprint: 4.00 × 2.00 = 8.00 m². The footprint is only one-quarter of the declared test area.
Assume the project review limit is 0.40 L/(s·m²) at −400 Pa relative to the surroundings. This rate is an invented project input, not a published class threshold. Assume the report gives 11.6 L/s at exactly that test condition, already corrected as required by the agreed test method.

Original example: area convention and rate are explicitly assumed. The 0.40 L/(s·m²) value at −400 Pa is not a standard class threshold; follow the project’s specified test method and area definition.
Total-flow limit = 0.40 × 32.00 = 12.8 L/s = 46.08 m³/h.
Measured normalized rate = 11.6 ÷ 32.00 = 0.3625 L/(s·m²).
Measured total is 1.2 L/s below the assumed limit, or 9.375% below it.
Using the 8.00 m² footprint would incorrectly reduce the limit to 3.2 L/s and incorrectly report a normalized rate of 1.45 L/(s·m²).
The arithmetic comparison meets this example’s assumed limit. Final acceptance still depends on the specified method, measurement uncertainty, report validity and all other applicable requirements. Retain unrounded values in the worksheet so a rounded display does not determine a borderline decision.
4. Keep test pressure and pressure direction attached
A result at −200 Pa cannot simply be compared with a rate declared at −400 Pa. The pressure difference across the casing has changed. Likewise, a positive-pressure result does not automatically establish the negative-pressure result: the specified test requirements and evidence must cover the relevant direction. Record the sign as well as the magnitude, using a clear reference to ambient pressure.
A sensitivity example shows why an informal conversion is insufficient. Suppose another report measured 8.0 L/s at −200 Pa. If a planning model explicitly assumes Q proportional to |p| raised to 0.65, extrapolation to −400 Pa gives 8.0 × (400/200)^0.65 = 12.55 L/s. An assumed exponent of 0.75 gives 13.45 L/s. These straddle the earlier 12.8 L/s example limit. Neither invented exponent authorizes acceptance; obtain results or normalization permitted by the governing test method.
Do not replace casing test pressure with the fan’s scheduled external static pressure. Different AHU sections can operate at different pressures relative to their surroundings. A field operating-pressure survey and a standardized casing leakage test answer related but distinct questions.
5. Avoid turning a class rate into an airflow percentage
At a hypothetical supply duty of 4,000 L/s, the 12.8 L/s limit equals 0.32% of supply flow. At 2,000 L/s it equals 0.64%, with the same area and test-rate assumption. These percentages merely divide a test-based leakage allowance by two chosen airflows. They do not establish actual leakage at either operating duty or redefine the leakage class.
External casing leakage also differs from internal transfer between a unit’s air streams and from leakage around a filter seal. A favourable casing calculation does not verify those separate paths. Keep their evidence and acceptance questions distinct in the submittal review.
6. Request a report that can be checked
Applicable standard and edition, test type and exact unit or construction identification.
Casing area schedule with an annotated test boundary.
Positive or negative test pressure, actual recorded pressure and reference condition.
Measured leakage, units, applicable corrections and measurement uncertainty.
Declared class or project limit, its source and the resulting comparison.
For a broader, organized AHU review, see the paid Air Handling Unit (AHU) Selection & Fault Diagnosis Handbook. Its casing and submittal-review coverage provides useful context. Keep the applicable standard, supplier declaration and actual test report alongside that reference when deciding whether the project requirement is satisfied.