AI-generated illustrative scene, not a product screenshot or a completed-project photograph. The worked calculation below uses explicit example inputs.


Dividing a tank's removable water volume by its initial outlet flow is tempting when preparing a drain-down estimate. The arithmetic is quick, but the assumed flow is not sustained as the water level falls. Even a simple outlet model predicts a longer interval once the changing driving head is included.


This example is a mathematical illustration for a vented, constant-plan-area tank with a small free-discharge opening. It is not a site drainage instruction, a tank-cleaning procedure or a means of selecting an outlet for a real installation. Access, structural condition, discharge destination, water quality and operational isolation require their own project review.


State the geometry and the hydraulic boundary


Assume a vertical-sided tank with constant horizontal area A = 6 m². Water level is measured above the centre of an idealized circular side opening of diameter 50 mm. The level falls from h1 = 2.0 m to h2 = 0.5 m. There is no incoming water, the tank remains at atmospheric pressure, and the outlet discharges freely to atmospheric pressure without a downstream pipe.


Use g = 9.81 m/s² and an assumed constant discharge coefficient Cd = 0.62. This coefficient is a teaching assumption, not a verified rating for a valve, drain assembly or fabricated opening. The Bureau of Reclamation's Water Measurement Manual explains that orifice coefficients depend on geometry and operating conditions, and that free and submerged discharge require different head definitions.


Opening area a = π × 0.050² / 4 = 0.00196350 m². Removed volume = A(h1 − h2) = 6 × (2.0 − 0.5) = 9.0 m³.


An assumed 6 square metre tank draining from 2.0 to 0.5 metres above a 50 millimetre opening takes 26.23 minutes in the constant-coefficient model, rather than 19.67 minutes at fixed initial flow.

Cd = 0.62 is assumed; no downstream pipe or inflow. Not a real drain design.


Calculate how the outlet flow changes


Under the stated approximation, outlet flow is proportional to the square root of the instantaneous head. The head is measured to the opening centre, not to an arbitrary tank datum. Keep the tank area A separate from the much smaller outlet area a in both the notation and the spreadsheet.


Q(h) = Cd a √(2gh). At h = 2.0 m, Q = 0.00762581 m³/s = 7.6258 L/s. At h = 0.5 m, Q = 0.00381291 m³/s = 3.8129 L/s.


In this example, the head falls to one quarter of its initial value and the flow falls to one half. A constant initial-flow estimate would remove the entire 9 m³ at 7.6258 L/s, giving only 19.67 minutes. That is a useful lower bound for this particular monotonically declining-flow model, but it is not its predicted drain-down interval.


Integrate the volume balance


Conservation of volume gives A dh/dt = −Q(h). Substitute the orifice expression and integrate between the two stated levels. Constant tank area and constant coefficient are essential assumptions in this closed-form calculation; change either and the same expression cannot simply be reused.


t = [2A / (Cd a √(2g))] × (√h1 − √h2).


t = [2 × 6 / (0.62 × 0.00196350 × √19.62)] × (√2.0 − √0.5) = 1573.60 s = 26.23 minutes.


The integrated interval is 6.56 minutes longer than the initial-flow estimate. Its average discharge is 9/1573.60 = 0.00571936 m³/s, or 5.7194 L/s. These differences follow from the assumed model only; they are not observed delays or a percentage performance promise for an installed tank.


Make the checks visible


Check the direction first: with no inflow and positive head, stored volume must decrease. At the higher level the flow should exceed that at the lower level. The calculated time should exceed volume divided by initial flow and be less than volume divided by final flow, which is approximately 39.34 minutes in this example.


A timestep spreadsheet can provide a second check. Use midpoint flow or a sufficiently refined numerical method, and reduce the timestep until the reported interval changes negligibly for the intended purpose. Do not silently step below the target level and count the entire final timestep. Report the interpolation or stopping rule used at the target.


Recognize the limits before applying a timing estimate


A downstream pipe, valve, strainer or submerged discharge creates a different hydraulic system. Tailwater may change the driving head; a restricted vent may invalidate the atmospheric assumption. A horizontal cylindrical tank has changing plan area, so it also needs a different volume-level relationship. Continued inflow must appear explicitly in the balance.


Do not extrapolate this small-opening, fully covered-orifice approximation all the way to an empty tank. As the water surface approaches the opening, the flow geometry can change and the coefficient may not remain applicable. For a real drain-down plan, obtain the actual tank geometry and outlet performance, include the destination's capacity and confirm the operational constraints with the responsible engineer. Keep the simple calculation as a transparent comparison case, not as authorization to drain.



Continue the calculation review



Sources and calculation basis


Primary references checked on 26 October 2026. The worked examples and diagrams are original illustrative calculations, not manufacturer selections or project approvals. Apply the stated limitations and the requirements governing the actual project.




Comments

Rated 0 out of 5 stars.
No ratings yet

Add a rating
bottom of page