DOAS Supply Humidity: Solve Each Zone’s Moisture Balance Before Selecting Dew Point

A dedicated outdoor air system can deliver the correct total ventilation flow and still leave one room too humid. The central total hides how much dry air reaches each zone and how much moisture that zone must remove. If the DOAS is expected to handle the room latent loads, determine its supply humidity from individual zone balances before selecting a coil leaving dew point.
Trane’s Dedicated Outdoor Air Systems application guide develops this zone-level approach and distinguishes the local latent load from the outdoor-air treatment duty. The original example below shows why a building-average moisture calculation can be insufficient, and why an airflow reduction needs another check.
1. State what the DOAS is responsible for
Assume the DOAS supplies air directly to each well-mixed room. Each room has a separate sensible-cooling system that provides no moisture removal in the illustrated operating case. There is no transfer air between rooms, and the dry-air outflow balances the DOAS dry-air inflow. The target is a steady room humidity ratio, without moisture accumulating in the air or furnishings.
Let G be the net room moisture generation in kg/s, mda the DOAS dry-air mass flow to that room in kg dry air/s, Wz the room humidity ratio and Ws the delivered supply humidity ratio, both in kg water/kg dry air. The steady balance is G = mda × (Wz − Ws), giving Ws = Wz − G/mda.
This equation identifies the required supply moisture content, not the ventilation requirement. Determine the minimum outdoor-air delivery independently using the applicable design basis. If infiltration is included in G, represent its net moisture contribution relative to the room target and its mass balance consistently. Do not add the same outdoor-air treatment moisture again as a room source.
2. Calculate two zones separately
Choose a hypothetical room target Wz = 0.00930 kg/kg dry air, or 9.30 g/kg. For reference, this is approximately 50% RH at 24°C and 101.325 kPa; the calculation uses Wz directly. Assume room A generates 2.40 kg/h of moisture and receives 0.30 kg dry air/s. Room B generates 1.80 kg/h and receives 0.40 kg dry air/s. All inputs are illustrative, not occupancy standards.
Convert moisture generation to kg/s before dividing by the air mass flow. For A, G = 2.40/3600 = 0.0006667 kg/s. The required humidity-ratio difference is 0.0006667/0.30 = 0.002222 kg/kg. Its supply limit is therefore 0.00930 − 0.002222 = 0.007078 kg/kg, or 7.078 g/kg.
For B, G = 1.80/3600 = 0.0005000 kg/s. Its required difference is 0.0005000/0.40 = 0.001250 kg/kg, giving Ws = 0.008050 kg/kg, or 8.050 g/kg. Room A requires the drier supply even though it receives less outdoor air. The relevant ratio is local moisture load divided by local dry-air delivery.
If both branches receive one common supply humidity, A sets the upper limit of approximately 7.078 g/kg under these assumptions. B can accept that supply for the moisture-removal calculation, but its eventual room humidity and any lower humidity limit still need review. Excess removal potential is not a justification to ignore comfort requirements.
3. Show how the central average hides a shortfall
Adding the room sources gives 4.20 kg/h and adding the flows gives 0.70 kg dry air/s. The tempting average calculation gives Ws = 0.00930 − 4.20/(3600 × 0.70) = 0.007633 kg/kg. That is wetter than room A can accept at its target condition.
At this averaged supply humidity, A removes only 0.30 × (0.00930 − 0.007633) × 3600 = 1.80 kg/h. Its source remains 2.40 kg/h, leaving 0.60 kg/h unbalanced at the target. B has 2.40 kg/h removal potential against its 1.80 kg/h source. The totals match, but B’s spare capacity does not travel to A in this no-transfer arrangement.

Original steady moisture example. Both zone targets are 9.30 g/kg dry air. No local dehumidification or interzone transfer is assumed; ventilation compliance is a separate check.
An independent steady-state check predicts A’s equilibrium humidity under the averaged supply: Wz,A = 0.007633 + 2.40/(3600 × 0.30) = 0.009856 kg/kg. That exceeds the 0.00930 target. The actual transient rise depends on room volume, moisture storage and changing loads; this equation predicts only the stated steady balance.
4. Convert humidity ratio to dew point on a declared pressure basis
Humidity ratio is the useful conserved quantity for this calculation. Dew point is a convenient equipment and controls target derived from it. PsychroLib’s documented psychrometric functions implement ASHRAE-based relationships between humidity ratio, water-vapor pressure and dew-point temperature, with the reference equations and units identified.
At total pressure P, vapor pressure pw = P × W/(0.621945 + W), with matching pressure units. For W = 0.007078 and P = 101.325 kPa, pw is approximately 1.140 kPa. The corresponding dew point is about 8.9°C. Use a reliable psychrometric calculation at the project pressure for final values rather than treating this rounded value as a universal DOAS setpoint.
Supply dry-bulb temperature can be higher than this dew point. Reheating dry supply air changes its dry-bulb temperature and relative humidity, but does not remove additional moisture or change humidity ratio if no moisture is added. Likewise, the required delivered dew point is not automatically the coil surface temperature, apparatus dew point or chilled-water temperature. Coil bypass and heat pickup require a manufacturer selection.
5. Recalculate when airflow falls
Suppose A’s dry-air flow is reduced from 0.30 to 0.20 kg/s while its moisture source remains 2.40 kg/h. The required supply humidity becomes 0.00930 − 2.40/(3600 × 0.20) = 0.005967 kg/kg, corresponding to approximately 6.4°C dew point at the same pressure. The original supply condition no longer balances A at its target.
This does not mean every occupancy-based airflow reduction needs colder air. If the moisture source falls in the same proportion as airflow, G/mda remains unchanged. However, infiltration, wet materials or processes may not follow occupancy. Build separate peak-moisture and part-load cases, retaining the relevant source schedules. Where the needed condition is infeasible, reconsider flow, local moisture removal or the approved control strategy.
6. Verify both delivery and equipment performance
Request selections for the relevant entering outdoor conditions, delivered dry-air flow and required leaving humidity. Include heat recovery, fan heat and reheat on their actual boundaries. The outdoor coil removes moisture from incoming outdoor air down to its leaving state; that equipment duty is different from the room’s G. Compare quantities only after drawing those boundaries.
During commissioning, record branch airflow, its density basis, delivered temperature and humidity, room condition, occupancy and other moisture sources over a stable interval. Check sensor calibration and distribution before concluding that a low central leaving dew point proves every room is served correctly. Preserve cases where the steady assumptions are not met rather than forcing the readings to balance.
For the next equipment-review step, see cooling-coil sensible and latent capacity checks. A suitable supply-humidity target still needs a verified selection that meets both duties.
For the broader psychrometric and room-to-coil workflow, the paid Cooling Load Design Handbook covers latent loads, outdoor air, airflow and coil duty. Use it alongside the actual zone moisture inventory and verified equipment selections. The defensible design result is a supply condition linked to each zone’s obligation, with its turndown limits visible.



Comments