Radiant Heat Gain vs Cooling Load: Carry Earlier Hours into the Calculation

A room receives 8 kW of internal heat for two hours. Does its air-conditioning system immediately need 8 kW, then zero when the source stops? That answer depends on how the heat enters the room and how the room stores it. A radiant portion can warm surfaces before becoming a load on the room air. Treating the operating schedule as the cooling-load schedule can therefore misplace both the peak and the tail.
ASHRAE’s Radiant Time Series supplemental guidance explains how calculated response factors convert current and earlier radiant gains into cooling loads. The short example here is an original arithmetic demonstration using invented coefficients. It is not an ASHRAE RTS calculation, a validated building model or a set of design factors.
1. Separate the immediate path from the delayed path
Consider one sensible heat-gain component in a hypothetical air-conditioned room. Assume 25% transfers immediately to the room air and 75% enters the radiant path. The fractions are chosen to make the arithmetic transparent; no particular appliance, luminaire or occupancy category is implied. Real fractions need the applicable source data and model definition.
For this illustration, the air system maintains a fixed room temperature, all the radiant energy eventually becomes cooling load in that same room, and no heat escapes to adjacent spaces or directly into a return-air path. Ignore latent load, envelope exchange and other components. These restrictions establish a clean energy balance and must not be silently carried into a real building design.
Define a four-interval response for the radiant portion: 20% appears as load during the current hour, 40% one hour later, 30% two hours later and 10% three hours later. The weights total one. This normalized finite response was invented for teaching; it is neither a typical heavy-room response nor a typical light-room response.
2. Write the time indices before entering numbers
Let Gt be the average sensible gain in kW during the one-hour interval beginning at time t. The instantaneous part is 0.25Gt. The delayed-path contribution, including its current-hour portion, is 0.75 × [0.20Gt + 0.40Gt−1 + 0.30Gt−2 + 0.10Gt−3]. Add these two parts once to obtain this component’s cooling load Lt.
The subscripts refer to earlier gain intervals. At 11:00, Gt−1 is the gain during 10:00–11:00. Labeling rows only “hour 11” without declaring whether the timestamp marks an interval start or end can shift a schedule by an hour. All rows below use interval-start labels and equal one-hour durations.
If calculating in a spreadsheet, keep separate columns for raw gain, immediate gain and each lagged contribution. That makes an off-by-one reference visible. The response already distributes the entire radiant share; adding a separate full radiant-load column would count the same heat twice.
3. Work the two-hour pulse and its tail
Assume zero gain before 09:00. The source then produces 8 kW during 09:00–10:00 and another 8 kW during 10:00–11:00. It is off afterward. Each active interval has 2 kW immediate gain and 6 kW assigned to the radiant path. Keep calculating beyond switch-off until the entire four-hour response has passed.
09:00: load = 2 + 0.20 × 6 = 3.2 kW.
10:00: load = 2 + 0.20 × 6 + 0.40 × 6 = 5.6 kW.
11:00: source is off; load = 0.40 × 6 + 0.30 × 6 = 4.2 kW.
12:00: load = 0.30 × 6 + 0.10 × 6 = 2.4 kW.
13:00: load = 0.10 × 6 = 0.6 kW.
The component peak is 5.6 kW in the 10:00 interval, compared with an 8 kW heat-gain peak. The component still imposes 4.2 kW after its source switches off. Neither result establishes the room’s total peak: another gain component could have a different schedule and response, and their loads must be combined at matching times.

Original hypothetical response only: 25% immediate, 75% radiant; invented radiant weights 0.20, 0.40, 0.30 and 0.10. Not ASHRAE design coefficients.
A common spreadsheet error keeps only the current-hour term. It would report 3.2 kW in each active interval and zero afterward. The missing contribution is not a legitimate diversity allowance. It is energy dropped when the previous-hour references were omitted.
4. Close the energy balance independently
Input energy is 8 kW × 2 h = 16 kWh. The modeled output is (3.2 + 5.6 + 4.2 + 2.4 + 0.6) kW × 1 h = 16 kWh. Immediate output contributes 4 kWh, and the radiant path contributes 12 kWh. Its normalized weights preserve the assigned radiant energy over the full response.
At the end of the 10:00 interval, cumulative input is 16 kWh while extracted load is only 8.8 kWh. The remaining 7.2 kWh is still awaiting release in this simplified model. The three subsequent outputs total exactly 7.2 kWh. That second balance catches an omitted tail even when the peak value looks plausible.
Normalization alone does not prove physical validity. Many invented coefficient sets can sum to one while giving unrealistic timing. Use the energy check to detect arithmetic defects, not to certify that a coefficient set represents the actual construction, furnishings or radiant distribution.
5. Handle midnight and operating schedules explicitly
Move the same two-hour source to intervals beginning 22:00 and 23:00. The loads become 3.2 and 5.6 kW before midnight, followed by 4.2, 2.4 and 0.6 kW at 00:00, 01:00 and 02:00 the next day. A spreadsheet that starts every day with three zero-history cells loses those carried-over contributions.
A repeating design-day calculation needs consistent wraparound history. A one-off event needs its actual preceding conditions. Neither can be chosen merely because it is easier to implement. ASHRAE’s full RTS procedure uses a 24-hour response, with conditions and assumptions appropriate to peak-load calculation; the four-hour teaching response is deliberately much shorter.
If the HVAC system shuts down, the calculated load needed to hold the room at its target temperature is not automatically the heat actually extracted. Room temperature and stored energy can change. Recovery load after an unconditioned period requires an appropriate transient model and operating schedule, rather than a tail copied from this fixed-temperature illustration.
6. Review software results at the right level
When a design report separates instantaneous and delayed sensible contributions, inspect its definitions and governing timestamp. The EnergyPlus Component Loads Summary documentation explains that its component breakdown includes estimated delayed contributions. An estimated breakdown is not a second independent full heat-balance calculation.
Once each zone has a complete load profile, use the coincident cooling-load check to combine zones at matching hours before choosing the central duty.
Retain the source schedule, radiant fraction, response provenance, history treatment and complete output series. Compare the sum of components at the selected peak, and keep room load separate from added outdoor-air and other coil loads. For the broader method choices and room-to-equipment workflow, the paid Cooling Load Design Handbook covers Heat Balance and RTS concepts, load boundaries and worked projects. It does not supply copyrighted ASHRAE tables or validate the invented coefficients used here.



Comments