Series Hydronic Pumps: Add Head at the Same Flow, Then Refind Duty

Two pumps placed one after another do not contribute two independent flow rates. The same stream passes through both, and each pump adds head at that shared flow. Yet the flow through the system can increase when the second pump runs. The distinction is between constructing a combined pump curve and finding where that curve meets the system.
That distinction matters when reviewing a proposed booster in an existing hydronic circuit. Adding two scheduled duty heads is not enough: the scheduled points may correspond to different flows, and neither pump will necessarily remain at its original operating point. Use matched-flow data, retain the individual contributions, and solve the revised intersection.
1. Confirm that the pumps are actually in series
Trace the liquid path. For a simple series arrangement with no intervening branch, bypass flow or storage change, the entire flow leaving pump A enters pump B. Pumps drawn consecutively on a schematic are not necessarily in this condition if a decoupler or branch separates them.
KSB's series-operation guidance describes adding the individual head values at a common flow. For two pumps, Hcombined(Q) = HA(Q) + HB(Q). Heads add vertically on a head–flow graph. The pumps need not be identical, but both curves must describe their actual speed, impeller and liquid conditions.
Choose the calculation boundary before handling connector losses. Either include the connecting pipe and fittings in the system characteristic or subtract those losses from the combined head available at the chosen external boundaries. Do not count the same connector twice.
2. Define an unequal-pump example
Consider an invented, completely filled closed-water loop with fixed valve positions. For this teaching calculation, there is no uncompensated static lift. Assume fixed pump speeds, negligible initial connector losses and quadratic system resistance. Flow Q is entered numerically in m³/h; head H is in metres of pumped liquid.
Use HA = 30 − 0.004Q² for pump A, HB = 24 − 0.003Q² for pump B, and Hsystem = 0.006Q². Each quadratic coefficient therefore has units m/(m³/h)². Treat both illustrative pump curves as defined only from 0 to 70 m³/h for this calculation; that mathematical domain does not establish a manufacturer's allowable operating region.
To establish the baseline, assume pump A alone serves the loop and pump B is absent or bypassed with negligible additional loss. Equating HA to Hsystem gives 30 − 0.004Q² = 0.006Q². Therefore Q² = 3,000, Q = 54.77 m³/h and H = 18.00 m. This baseline deliberately does not represent flow through an idle pump B.
3. Add heads, then solve again
The combined curve is Hcombined = 54 − 0.007Q². At any chosen flow, the 54 m intercept and the combined coefficient arise from adding the two pump equations. They do not mean the installed head becomes 54 m whenever both pumps run.
Equate the combined curve to the same system: 54 − 0.007Q² = 0.006Q². Thus Q² = 54 / 0.013 = 4,153.846, Q = 64.45 m³/h and Hsystem = 24.92 m. This intersection lies within the assumed curve domain.
Now return to each individual curve at 64.45 m³/h. Pump A contributes 30 − 0.004 × 4,153.846 = 13.38 m. Pump B contributes 24 − 0.003 × 4,153.846 = 11.54 m. Their sum is 24.92 m, matching the system requirement. Both pumps handle 64.45 m³/h, rather than half that flow.
Compared with pump A alone, system flow rises by (64.45 / 54.77 − 1) × 100 = 17.67%. Pump A's own head contribution falls from 18.00 to 13.38 m because it moves rightward along its fixed-speed curve. The total system head nevertheless rises because pump B adds energy to the same stream.

Invented fixed-speed curves and a closed-loop system, before the additional connector-loss case. At the series duty, both pumps carry 64.45 m³/h; their individual heads are 13.38 m and 11.54 m.
4. Catch a plausible wrong answer
At the old 54.77 m³/h flow, pump A produces 18.00 m and pump B would produce 15.00 m. Their sum is 33.00 m. That point belongs on the combined pump curve, but the unchanged system needs only 18.00 m at that flow. It is not an equilibrium operating point.
The excess available head drives the example toward a higher flow until available and required heads coincide at 64.45 m³/h and 24.92 m. Grundfos's pump-curve lesson identifies that pump/system intersection as the duty point. Keeping a “curve construction point” separate from a “predicted duty point” prevents the 33 m result being mistaken for installed performance.
The phrase “series adds head, not flow” is useful only as a curve-combination rule. It does not say that changing the pump arrangement leaves the system flow unchanged. An actively controlled installation may hold flow constant by changing speed or valve resistance, but that is a different calculation with a stated control objective.
5. Include new connection resistance
Suppose the added pipe and fittings introduce Hconnector = 0.0005Q² m, with Q still in m³/h. Keep both pump curves unchanged and include that resistance on the system side. The new balance is 54 − 0.007Q² = (0.006 + 0.0005)Q².
Now Q² = 4,000 and Q = 63.25 m³/h. The original circuit requires 24.00 m, the added connector requires 2.00 m, and the pumps supply 26.00 m in total. Individually, pump A supplies 14.00 m and pump B supplies 12.00 m. This second balance shows exactly where the additional head is spent.
6. Review both pumps at the new condition
The combined intersection is a hydraulic result, not a complete equipment selection. Retrieve each pump's permitted operating region, efficiency, input-power and suction-performance data at the common flow. Different pumps can have different acceptable limits even while their heads add correctly. Do not average their efficiencies or assume that a higher combined head proves a suitable selection.
KSB also highlights the increased pressure imposed on downstream pump casings and seals, together with suction and staging concerns. Check the manufacturer's permitted inlet pressure and total working-pressure envelope. Review the actual idle-pump or bypass arrangement and approved starting/stopping sequence; a stationary pump cannot simply be deleted from the hydraulic model.
Bell & Gossett's application guide also distinguishes system duty, individual-pump duty and single-pump operation. A useful review record lists the common flow, head contribution of each pump, connector loss and system requirement for every intended operating combination. If valves or speeds change, update those conditions rather than extending this one fixed-resistance example to every operating hour.
The paid Chilled Water System Design Handbook provides broader pump-selection, head-calculation and hydronic-design context for that record. Use its design workflow alongside current manufacturer curves. The defensible series result is the one that closes the head balance at a shared flow and remains acceptable for both individual pumps.